Summit, NY (July 2018) New 16EL Tribander and 8EL 6M at the RHR W2/Summit QTH. Installed by Ray and Bobby Robert HigginsJuly 31, 2018 Facebook0 Twitter LinkedIn0 Reddit 0 Likes